Exact field mapping
Agree which BOM revision, part number, stock balance and machine skill fields the workflow reads and updates.
AI workflows & automations
Missing parts and mismatched job records hold up production. Our blueprint maps material fields, shortage rules, system links and supervisor checks for your AI workflows and automations.
Unclear rules and messy links break shop-floor automations
Building an automation without agreed fields and sign-off rules creates noisy alerts and missed shortages. A clear blueprint maps your bill of materials revisions, stock checks, station guides and job records first. Your production manager sees exactly what AI prepares, what fixed rules check and what staff approve before any code is written.
Agree which BOM revision, part number, stock balance and machine skill fields the workflow reads and updates.
Mark the exact points where planners or supervisors must verify material conclusions and approve schedules or job releases.
Set the layout for shortage dashboards, station instruction drafts and reconciled business system or production system job records upfront.
Agree every rule and system link before building
We work with your production lead to turn daily floor habits into a clear, testable design document your team can sign off.
We inspect your current BOM revisions, procedure documents, stock tables and job orders across business system, production system, Dynamics 365 and product design system.
We separate fixed stock and status checks from AI tasks like drafting station guides, explaining exceptions or proposing schedules.
We define the review lists where supervisors inspect unresolved blockers, shortage dependencies or operator feedback before approving action.
We agree sample jobs, edge cases and accepted outputs so you know how the finished automation will be checked.
Every blueprint covers the records, rules, tool connections and staff checks needed for your chosen production workflow.

Define how approved BOM revisions are compared, which component substitutions are valid and what triggers a release blocker for review.

Map approved product design system or procedure files to each station, set source-linked AI drafting rules and design the operator feedback log.

Document demand inputs, machine limits, material readiness and staff skills so proposed sequences stay within your plant's real limits.

Specify how approved job records are created, how operation starts and completions are captured and how actual quantities reconcile.
Not every production task needs AI. Your blueprint shows where fixed rules check stock balances and update business system or production system records, and where AI workflows and automations read procedures, draft station guides or explain shortage blockers. Your team verifies every material conclusion.

We design with your production records, not generic diagrams
MxD sits with your production owner to inspect real BOMs, shortage reports, station guides and business system or production system fields. Together we define the exact tool links, review screens and test cases. You keep full say over every approval rule before we move to build.
Manufacturing Blueprints
Confirm which BOM or shortage bottleneck to tackle first, trace a live job release or set daily queue and shift cover.
A blueprint stops guesswork. It confirms your exact BOM fields, shortage rules, business system or production system links and supervisor sign-off points before build work begins.
Share sample BOM revisions, current shortage reports, station procedures, schedule constraints and access to the manager who owns job releases.
You receive a signed-off design covering data inputs, fixed rules, AI prompts or drafting scope, tool connections, review screens and acceptance test cases.
Fixed rules handle exact checks like stock counts, BOM revision matches and status updates. AI assists with reading documents, drafting station guides, explaining exceptions or proposing schedules.
We list the exact tables, fields and permissions needed in your supported systems, such as business system, production system, Dynamics 365, product design system or machine telemetry.
Review points sit before every material decision, including release blockers, schedule changes, station instruction updates and final job releases.
We agree the exact station format, required revision numbers and source links so operators and supervisors can verify every step quickly.
Yes. We document your approved substitution rules so the workflow flags valid alternatives and routes unapproved changes to your team.
We list your demand priorities, machine capacities, material readiness rules and required operator skills so proposed schedules respect floor limits.
We map the matching fields during the blueprint and set a clear exception rule to flag any unmapped code for staff review.
We walk through real past jobs, including a shortage, a late revision and a disrupted schedule, to confirm every rule handles them properly.
Your named production owner signs off the rules, review screens and accepted outputs before any build or system connection begins.