Clear field mapping
Every meter reading, service-point ID, move date and asset code is mapped between your source and target systems.
AI workflows & automations
Design AI workflows and automations around meter readings, device IDs and move dates. Agree the asset and mapping fields, supported tool links and owner checks before the build.
Agree every field, rule and approval before code starts
Meter records, asset details, network maps and field notes need agreed matching rules. Your blueprint defines the device IDs, move dates, checks and review screens used in the chosen task. Your operations owner accepts the inputs and output rules before tools are connected.
Every meter reading, service-point ID, move date and asset code is mapped between your source and target systems.
We specify where fixed rules run and where anomaly, vision or dispatch models need backtesting and measured accuracy.
The blueprint marks every point where utility and engineering owners must approve switching, field work or billing inputs.
How we design your utility blueprint
We work with your operations and engineering leads to turn daily rules and system limits into a clear build specification.
We list the exact meter intervals, device serials, account references, inspection photos and job constraints needed from your current systems.
We define validation thresholds, reconciliation logic, exception reasons and backtesting plans for any forecasting, vision or scheduling models.
We document how meter data management, Oracle Utilities, asset records tool, GIS and field tools exchange records, including read, write and retry limits.
Your operations owner reviews mock review lists, handover checklists and dispatch proposals and signs off what counts as an accepted output.
Each blueprint covers the data rules, tool connections and review points for your chosen energy and utilities workflow.

Defines interval formats, fixed validation checks, backtesting datasets for anomaly models and the exact source evidence shown in review lists.

Maps device-to-service-point matching rules, inconsistent date flags, approved move-date capture and the steps required to verify a completed handover.

Sets asset observation fields, photo capture standards, candidate defect labels and the false-positive and false-negative thresholds required before use.

Lists crew skills, locations, parts, access rules and supported asset records tool, GIS and field system links, plus owner sign-off for schedule changes.
Your blueprint separates fixed rules from AI support. It states what AI reads, flags or proposes, what the automation moves between systems, and what your staff decide. There are no hidden steps or unapproved writes to live utility records.

Joint design with your utility and engineering leads
MxD drafts the field maps, validation tables, review screen layouts and test cases using your real sample records. Your operations owner checks every rule, confirms which system links are supported and approves the acceptance criteria. You get a clear build plan before any integration work begins.
Next steps after blueprinting
Review the main offer, trace a live workflow run or plan daily ownership for your designed build.
You receive field maps, fixed validation and matching rules, AI model test criteria, supported system link specs, review queue designs and owner acceptance criteria.
Usually sample exports, field lists and system documentation are enough. We confirm supported API or file links with your IT and operations leads.
Fixed rules handle exact checks like device ID matching and move dates. AI models are specified only where anomaly detection, image review or schedule optimisation adds clear value.
We define the representative operating data used for backtesting and agree the review thresholds with your operations owner before any model goes live.
It defines which asset defects are flagged, how field photos are captured, how staff review flags and how false-positive and false-negative rates are measured.
We list each supported read and write action, required record IDs, authentication owner and what happens when a system rejects an update.
Your named utility or engineering operations owner signs off the rules, review screens and accepted outputs, alongside any IT owner approving tool access.
We recommend blueprinting one primary workflow first so rules stay sharp. Connected handovers, such as inspection to dispatch, are mapped cleanly at the boundary.
Every switching decision, field intervention, billing input and material schedule change is marked as a mandatory staff approval gate in the workflow diagram.
The blueprint lists missing-field rules, showing whether the automation pauses the item, requests missing evidence or routes it to a named review list.
Yes. We write test cases from your real edge cases—such as swapped meters, split move dates and restricted site access—to prove the build works.
Yes. Rules are documented clearly so your team can request controlled updates during build or later through your operating process.