Lock down record fields
Agree drawing numbers, revision codes, work package tags and mandatory submittal evidence before connecting your systems.
AI workflows & automations
Agree drawing codes, site-question references and submittal rules before building AI workflows and automations. Your blueprint sets out the fields, supported tool links and site-lead review points.
Agree every site rule before building
Construction records fail when drawing codes, package names and approval paths do not match across tools. A blueprint settles those details upfront. You see exactly what AI reads or drafts, which fixed rules control Autodesk Build or business system updates, and where site owners must sign off before a single connection is built.
Agree drawing numbers, revision codes, work package tags and mandatory submittal evidence before connecting your systems.
Define where AI extracts or drafts text, and where fixed rules block incomplete records or superseded files.
Name the exact engineer, superintendent or site manager who approves methods, site question answers and progress views.
What we design together
We work from your real project registers and site forms. Every rule, review list and tool link is written down in plain language for your team to accept.
We inspect your drawing logs, site question forms, submittal packs and daily reports across Autodesk Build, BIM/CDE, reporting tools and business system.
We specify required fields, superseded-file checks, scope matching rules and exact conditions that send an item to a review list.
We set clear boundaries for source-linked site question drafting, submittal extraction, report structuring and any visual progress checks.
Your site operations lead reviews sample outputs, failure paths and handover screens, then signs off the blueprint for build.
Each blueprint produces practical design documents your site managers and technical leads can check, edit and approve before build work begins.

Field mappings for work areas, revision states, superseded flags, site question-to-drawing links and technical reviewer routing rules.

Extraction templates for scope requirements, product evidence checklists and fixed validation rules for routing incomplete submissions.

Structured layouts for observations, photos, disruption notes and milestone comparisons, including review rules for flagged progress gaps.

Agreed data flows between supported site tools, retry paths for failed saves and clear screens for staff exception handling.
Site projects always produce messy inputs: unlabelled photos, partial vendor certificates or late drawing revisions. Designing AI workflows and automations in a blueprint lets your team decide how each messy case routes to staff before live crews depend on it.

Practical design with your site leads
MxD sits down with your document controller, site manager and technical leads to map real registers, not abstract diagrams. We document exact Autodesk Build, BIM/CDE and business system fields, review screens and test cases. Your team approves every rule and boundary before build work starts.
From blueprint to live site work
Use your agreed rules to trace a real site workflow, set daily ownership or revisit starting scope.
Share sample drawing registers, recent site questions, product submittals, daily site reports and a list of the supported tools and approval roles on your project.
You receive field mappings, fixed validation rules, AI task boundaries, supported tool links, review list designs, review points and acceptance test cases.
Fixed rules handle matching, status checks and record updates. AI is used only where reading unstructured documents, extracting evidence or drafting source-linked text helps staff.
Yes. We check available fields, permissions and supported connections for your chosen tools so the build matches what your systems actually allow.
The blueprint sets fixed rules to match approved revisions to work packages, mark older sheets as superseded and track acknowledgement conflicts.
The design requires source links to exact drawings or issues and routes every drafted response or summary to a named technical reviewer before closure.
We map required submittals from approved scope, define what counts as complete product or method evidence and set the review list for missing items.
The blueprint defines how candidate differences are flagged for staff review and sets how false-positive and false-negative rates will be measured before wider use.
Your named site operations or technical owner reviews the rules, sample outputs and review screens, then gives formal approval to build.
Yes. Changing field rules, reviewer lists or exception paths during design is fast and avoids rework once connections are built.
Yes. It defines exactly where a record stops if a file is unreadable, a field is missing or a supported system rejects an update.
It can set standard rules for drawings, site questions and reports while listing project-specific fields like package codes and reviewer names as configurable inputs.